homepage home
subscribe to Southeast Construction magazine subscribe
newsletters free e-newsletter
advertise
industry jobs industry jobs
Mcgraw-Hill Construction Logo
Southeast Construction Logo
Order Your RISK FREE Subscription
comment

Contract Award Expected in June for Tampa Reservoir Repair

Text size: A A
title
Photo: Tampa Bay Water
----- Advertising -----

In June, Tampa Bay Water expects to select either Granite Construction Co., Kiewit Infrastructure South or Skanska USA Civil Southeast as the design-build-maintain contractor for the cracked C.W. Bill Young Regional Reservoir. Ranging from $120 million to $170 million, the three recently received bids are to repair the soil-cement erosion-control layer and expand the reservoir by about 40%. Notice to proceed for permitting is scheduled for Sept. 1, with a construction start anticipated a year later. About 12 months after its 2005 opening, cracks began forming in the 15.5-billion-gal reservoir, designed by HDR Engineering and built by Barnard Construction.

 

----- Advertising -----
  Blogs: SE Staff   Blogs: Other Voices    
Our blog delivers the latest news, insights, and opinions about ENR Southeast.
Reader Photos
Photos from ENR Southeast Photo Showcase
----- Advertising -----
 Reader Comments:

Sign in to Comment

To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.

We welcome comments from all points of view. Off-topic or abusive comments, however, will be removed at the editors’ discretion.