The U.S. Army Corps of Engineers, Savannah District, broke ground on a $32.9-million barracks project for a new Warrior in Transition Complex at Fort Bragg, N.C., in June.
----- Advertising -----
B.L. Harbert International of Birmingham, Ala., will lead the design-build construction of the 153,911-sq-ft barracks facility that will accommodate 256 soldiers, along with a 240-space parking garage. The project is scheduled for completion in March 2012.
The barracks facility is being designed and built to achieve LEED Silver status.

Sign in to Comment
To write a comment about this story, please sign in. If this is your first time commenting on this site, you will be required to fill out a brief registration form. Your public username will be the beginning of the email address that you enter into the form (everything before the @ symbol). Other than that, none of the information that you enter will be publically displayed.