250 Park Avenue

Project Team
Owner: Battalia Properties
Location: Winter Park, Fla.
Cost: $13.6 million
Concrete Contractor: Gate Precast Co., Kissimmee, Fla.
General Contractor: Jack Jennings & Sons, Orlando
Architect: Farmer Baker Barrios Architects, Orlando

Gate Precast Co.'s charge on this 250 Park Avenue project was to utilize its architectural precast concrete panels to transform the exterior of an existing, occupied building using "old-style" tavern brick to blend in with the area's historic district. The company's skilled craftsmen created detailed forms that displayed the owner's motif in a repetitious theme on the spandrels.

The project was undertaken to revitalize the existing building. As a result, the project's architect, Farmer Baker Barrios of Orlando, was looking for a new exterior system to cover the existing cladding. Though the design firm originally chose hand-set brick to accomplish this, Gate Precast proposed during the rendering stage that the project convert to brick inlay architectural precast panels.

The project measured approximately 120,000 sq. ft. and included roughly 33,580 sq. ft. of architectural precast concrete.


Judge's Award-Construction

Judges' Award - Design

Best Private Building

Best Public Building

Best Multiresidential Project

Best Retail Project

Best Hospitality Project

Best K-12 Public School Project

Best Educational Project

Best Concrete Project

Best Private Design

Award of Excellence, Multiresidential

Award of Excellence, Transportation Building

Award of Excellence, Transportation Infrastructure

Award of Excellence, Civil/Utilities

 

Best of 2004 - Awards of Merit:

 


advertisement





 


Network Sponsors

© 2012 The McGraw-Hill Companies, Inc.
All Rights Reserved