Top 50 Highway Projects
A Look at the Top 50 Projects That
Will be Under Construction During 2004
Here, Southeast Construction
has ranked by construction cost the top 50 highway projects
that are currently under construction, or have been awarded
prior to publication. To create this list, we used information
from Dodge Construction Reports, major highway contractors
and engineering firms, and material supplied by the four
state transportation departments, as well as various local
transportation authorities. We also used back issues of
Southeast Construction,
including our previous annual Top Highway lists.
Scott Judy
1. Cooper
River Bridge, between Charleston and Mt. Pleasant, S.C.
Owner: South Carolina Department
of Transportation.
Contractor: Palmetto Bridge
Constructors, a joint venture of Tidewater Skanska USA, Virginia
Beach, Va., and HBG Contractors/Flatiron Structures Co., Longmont,
Colo.
Contract Cost: $632 million.
Start/Completion Dates: 2002/Summer
2005.
Project Details: Building the
longest cable-stayed span in the North America. Two diamond-shaped
towers will support a 1,546-ft. span.
2. Interstate 4 Expansion, Tampa
Owner: Florida Department of
Transportation.
Contractor: Gilbert Southern
Corp., Sunrise, Fla.
Contract Cost: $156.5 million.
Start/Completion Dates: February
2004/Summer 2008.
Project Details: Reconstruct
a four-lane roadway into an 8-lane facility, from west of
14th Street to east of 50th Street.
3. Reversible-Lanes Bridge, Tampa
Owner: Tampa-Hillsborough Expressway
Authority.
Contractor: PCL Civil Constructors,
Tampa.
Contract Cost: $140 million.
Start/Completion Dates: February
2003/2005.
Project Details: Construction
of most of the 6-mi. portion of an elevated reversible-lanes
bridge.
4. Knightdale Bypass, Raleigh,
N.C.
Owner: North Carolina Department of Transportation.
Contractor: North Carolina Constructors,
a joint venture of HBG Flatiron, Longmont, Colo., and Lane
Construction Co., of Meriden, Conn.
Contract Cost: $131 million.
Start/Completion Dates: July
2002/August 2005.
Project Details: Design-building
9.6 mi. of new six-lane freeway, including 23 bridge structures.
5. Interstate 4/St. Johns River
Bridge, Sanford, Fla.
Owner: Florida Department of
Transportation.
Contractor: Granite Construction
Co., Tampa.
Contract Cost: $110 million.
Start/Completion Dates: January
2001/Spring 2004.
Project Details: The existing
bridge the St. Johns River will be replaced with twin bridges.
6. Interstate 95/295 Interchange,
Jacksonville, Fla.
Owner: Florida Department of
Transportation.
Contractor: Amec Civil, Fort
Myers, Fla.
Contract Cost: $105 million.
Start/Completion Dates: November
2001/Early 2005.
Project Details: Extending I-295
over I-95 to the existing portion of S.R. 9A at U.S. 1 near
Greenland Road.
7. Palm Beach International Airport
Interchange, West Palm Beach, Fla.
Owner: Florida Department of
Transportation.
Contractor: Modern Continental
South, West Palm Beach, Fla.
Contract Cost: $103 million.
Start/Completion Dates: July
2000/July 2004.
Project Details: Reconstructing
the I-95 interchange at Belvedere Road in West Palm Beach
includes 14 new bridges and ramps and the expansion of approximately
1.8 mi. of interstate.
8. Greensboro Western Loop, Greensboro,
N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Thompson Arthur
Division of APAC, Atlanta.
Contract Cost: $101.6 million
Start/Completion Dates: September
2003/July 2007.
Project Details: Building a
4.3-mi. section of the Greensboro Western Loop from Interstate
40 to north of Bryan Boulevard.
9. Interstate 85 Expansion, Mecklenburg
Co., N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Blythe Construction,
Charlotte, N.C.
Contract Cost: $87.7 million.
Start/Completion Dates: December
2002/October 2005.
Project Details: Widening I-85 from U.S. 29 and North Carolina
49 Connector to State Road 2467.
18.
10. Wilmington Bypass, Wilmington,
N.C.
Owner: North Carolina Department
of Transportation.
Contractor: GLF Construction
Corp., Miami
Contract Cost: $84.5 million.
Start/Completion Dates: March
2001/December 2004.
Project Details: Constructing
U.S. 17 from west of U.S. 421 to west of U.S. 117/North Carolina
133.
20.
11. Interstate 77 Expansion, Charlotte,
N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Rea Construction,
Charlotte.
Contract Cost: $84 million.
Start/Completion Dates: December
2001/November 2004.
Project Details: Widening roughly
8.1 mi. of I-77 from four to eight lanes, within the existing
right-of-way.
12. Hathaway/St. Andrew Bay Bridges,
Bay Co., Fla.
Owner: Florida Department of
Transportation.
Contractor: Granite Construction,
Tampa.
Contract Cost: $81.5 million.
Start/Completion Dates: August
2000/Spring 2004.
Project Details: Design-building
new twin bridges measuring approximately 3100 ft. long.
13. Interstate 275/I-4 Interchange,
Tampa
Owner: Florida Department of
Transportation.
Contractor: Granite Construction
Co., Tampa.
Contract Cost: $79.5 million.
Start Date: June 2002.
Project Details: Approximately
2.75 mi. of interchange improvements, including modifying
existing ramps, constructing new ramps, reconstruction and
widening of existing roadway pavement, bridge work.
14. Interstate 75 Expansion, Lowndes
Co., Georgia
Owner: Georgia Department of
Transportation.
Contractor: Douglas Asphalt
Co., Douglas, Ga.
Contract Cost: $74.9 million
Start/Completion Dates: May
2002/March 2005.
Project Details: 13.6 mi. of
widening I-75, including three bridges.
15. Interstate 85 Interchange,
Jacksonville, N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Granite Construction
Co., Roswell Ga.
Contract Cost: $73.3 million.
Start/Completion Dates: April
2001/December 2004.
Project Details: Widening I-85
from west of Broad Street to west of Camden Avenue.
16. Interstate 4 Widening, Polk
Co., Fla.
Owner: Florida Department of
Transportation.
Contractor: Martin K. Eby Construction
Co., Maitland, Fla.
Contract Cost: $72.7 million.
Start/Completion Dates: December
2002/2005.
Project Details: Widening Interstate
4 from U.S. 98 to east of S.R. 557 in Polk County.
17. St. George Island Bridge,
St. George Island, Fla.
Owner: Florida Department of
Transportation.
Contractor: Boh Bros. Construction,
New Orleans, and Sverdrup Civil, Tampa.
Contract Cost: $71.6 million.
Start/Completion Dates: August
2000/Spring 2004.
Project Details: Design-building
a 21,615-ft.-long bridge over Apalachicola Bay.
18. Interstate 110/I-10 Interchange,
Pensacola, Fla.
Owner: Florida Department of
Transportation.
Contractor: Archer Western Contractors,
Fort Lauderdale, Fla.
Contract Cost: $71 million
Start/Completion Dates: June
2002/June 2007.
Project Details: Approximately
3.1 km of roadway construction, interchange construction,
eight bridges and other construction from C.R. 95A-Old Palafox
to East S.R. 291-Davis Highway.
19. S.R. 826/Palmetto Expressway,
from 62nd St. to N.W. 103rd Street, Miami
Owner: Florida Department of
Transportation, District Six.
Contractor: The DeMoya Group,
Miami.
Contract Cost: $68.5 million
Start/Completion Dates: January
2003/April 2006.
Project Details: Includes reconstruction
of two major interchanges at N.W. 74th Street and Okeechobee
Road, as well as the addition of one general-use lane in each
direction.
20. Interstate 95 Expansion, Palm
Beach Co., Fla.
Owner: Florida Department of
Transportation.
Contractor: PCL Civil Constructors,
Coral Springs, Fla.
Contract Cost: $67.3 million
Start/Completion Dates: August
2002/September 2006.
Project Details: Expanding I-95
from six to 10 lanes from Blue Heron Boulevard in Riviera
Beach to PGA Boulevard in Palm Beach Gardens.
21. Northern Wake Expressway,
Wake Co., N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Vecellio & Grogan,
Beckley, W. Va.
Contract Cost: $67 million.
Start/Completion Dates: September
2003/April 2006.
Project Details: Constructing
a 7.3-mi. section of Interstate 540 from east of U.S. 1 south
of Perry Creek Road to U.S. 64 east of Knightdale.
22. Interstate 75 Expansion, Cook
Co., Ga.
Owner: Georgia Department of
Transportation.
Contractor: Douglas Asphalt
Co., Douglas, Ga.
Contract Cost: $67 million.
Start/Completion Dates: February
2002/September 2004.
Project Details: Widening and
reconstructing approximately 13.7 mi. of I-75 at State Road
133 to the Cook County line. Also includes construction of
three bridges.
23. Interstate 85 Expansion, Durham
Co., N.C.
Owner: North Carolina Department
of Transportation.
Contractor: Granite Construction
Co., Roswell, Ga.
Contract Cost: $66.6 million.
Start/Completion Dates: July
2003/December 2006.
Project Details: Widening 9.7
mi. of I-85 to eight lanes from the Orange/Durham county line
to north of Midland Terrace Road and east of Cheek Road.
24. Interstate 95 Expansion, Anderson
Co., S.C.
Owner: South Carolina Department
of Transportation.
Contractor: Lane Construction
Corp., Meriden, Conn.
Contract Cost: $65.4 million.
Start Date: March 2001
Project Details: Widening a
16.8-mi. section of I-95 in Anderson County; includes asphalt
resurfacing and bridge maintenance/rehabilitation.
Projects 25-50
|